FAQs
More FAQs- Is drying and curing the same thing?
- I think my hard surface floor's appearance should be improved, but I'm concerned about the price. What should I do?
- Are there instructions to follow after my hard-surface floors are cleaned?
No. Drying means that the surface layer is no longer wet or damp to the touch. Curing, on the other hand, means that urethane has reached its maximum hardness thereby providing the necessary protection of your flooring.
Consider the cost of non-action. Any finish will enhance the appearance of your floor in addition to providing protection. While refinishing your hard floor bears a cost, replacement of the floor due to neglect bears a much higher cost.
Before you walk on your floors, it’s best to allow drying time of at least 4 hours but we recommend 8 hours. Be cautious and protect floors from getting wet for 24 hours after application of either finish as it is not yet thoroughly cured. You can return furniture to your floors (with suggested use of felt pads) after 24 hours and return rugs to floors after 24 hours.